Installation

Our company specializes in the fabrication and installation of equipment such as oil sludge tanks, brine tanks, and more. We excel in WINDBOX upgrade projects, reactor shell fabrication, isolation valve installation, and piping installation contracts. We provide sales, design, construction, and maintenance services for a wide range of industrial furnaces, kilns, equipment, pipelines, and refractory materials used in furnaces and corrosive environments. We are a trusted refractory solutions provider for major companies such as CPC and Formosa Plastics, boasting a wealth of experience and a strong track record in the industry.

Installation

Our company specializes in the fabrication and installation of equipment such as oil sludge tanks, brine tanks, and more. We excel in WINDBOX upgrade projects, reactor shell fabrication, isolation valve installation, and piping installation contracts.

We provide sales, design, construction, and maintenance services for a wide range of industrial furnaces, kilns, equipment, pipelines, and refractory materials used in furnaces and corrosive environments.

We are a trusted refractory solutions provider for major companies such as CPC and Formosa Plastics, boasting a wealth of experience and a strong track record in the industry.

Project Achievements

Fabrication and Installation of Post-Combustion Furnace Back-End Brine Tank Equipment for Waste Liquid
Fabrication of Reactor Shell
Waste Gas Incinerator Windbox Upgrade
Year Owner Project
2022 Taiwan _____ WINDBOX Update Project
2021 Plastics _____ Refinery Furnace Inspection Reservation Project
2021 South _____ Equipment Fabrication and Installation for Post-Combustion Furnace Brine Tank
2021 Taiwan _____ Oil Oil Sludge Tank Fabrication and Installation at Wastewater Treatment Plant
2021 Taiwan _____ Composite Powder Silo System Addition and Improvement Piping Project
2021 Taiwan _____ Expansion Turnkey Project – Non-Metallic Piping Project
2020 Cooperation _____ Chemistry Reactor Shell Fabrication Project
2019-2020 Taiwan _____ Waste Gas Incinerator Windbox Update Project
2019-2020 Taiwan _____ WINDBOX Update Project
2016-2018 Plastics Dustproof Net Addition Project for Flushing Channel
2016 South _____ Preheating Equipment and System Update for Thermal Oil Boiler Exhaust Gas Treatment
2016 South _____ Exhaust Gas Treatment Equipment and System Update for Power Boiler Flue Gas Desulfurization (FGD) Absorption Tower
2012-2014 Wan _____ Above-Ground Pipe Prefabrication and Installation Project
2012-2014 Wan _____ Oil Connected Pipeline Project
2012-2014 Wan _____ Underground Oil Piping Project
2012 China _____ Oil Environmental and Combustion Equipment Improvement Piping Project
2012 Plastics _____ Ultra-Low NOx Combustor Equipment Installation Project
2012 Taiwan _____ Oil Oil Instrument PIPE Pressure Guide Tube Installation and Pressure Testing Project
2012 China _____ Oil Pipe Rack Steam Tracing Piping Prefabrication and Installation Project
2012 South _____ Tower Tank Frame Stand Dismantling and Installation Project
2012 South _____ Tower Tank Frame Stand Dismantling and Installation Project
2012 _____ Chemical Equipment Update Project
2012 _____ Chemical Equipment Dismantling and Installation Project
2011-2012 Wan _____ Tower Tank Replacement and Installation Project